“Serving all your real estate needs throughout
Lamoille & Washington counties of Northern Vermont & beyond”

PERMITTING

This is a very important consideration before purchasing a lot.

  • The realtor or the landowner should be able to provide you with what permitting is required before you can build on the land.

  • However, this does not replace the need for you, or your representative to investigate the need for any local and state permitting. In addition, you should determine if there are any deeded restrictions, or environmental concerns relative to the parcel of land that you are considering.

  • Always consult with legal counsel relative to permitting and other restrictions, before purchasing any land.

  • Most lots on the market are permitted to the point where only building and curb cut permits are required before construction can begin.

  • Permitting requirements are of crucial importance. They can be expensive in both time and money.

Phone: 802.253.9771
Toll Free: 800.253.2700
1800 Mountain Rd
Stowe, VT 05672